Location:
Sidney, BC
Client:
BC Ferry Services Inc.
Contract Value:
$21M
Type of contract:
Start Date:
January 2006
Completion Date:
August 2007
Demolition consisted of timber, concrete and steel structures, including:
Rebuild consisted of design, supply, fabrication & installation of a new ‘floating’ berth, including:
Instead of the traditional deep foundation construction, VanPile proposed a floating berth made up of five concrete pontoons. This ward-winning concept allowed for a significant reduction in overall project cost and schedule, as well as for the terminal to remain fully operational over the project’s duration.