MCLOUGHLING BAY FERRY TERMINAL REPLACE FLOATING LEADS

Location:

McLoughling Bay Bella Bella, BC

 

Client:

BC Ferry Services Inc.

 

Contract Value:

$6.5M

 

Start Date:

 

Completion Date:

June 2014

 

Project to replace floating leads at McLoughlin Bay Ferry Terminal carried out alongside active Heiltsuk First Nations Fishing Farm without incidents.

  • Vanpile’s scope of work on replacing floating leads consisted of:
  • Supplying and installing three concrete pontoons, connected on site
  • Drilling and grouting twelve rock chains to secure the floating concrete lead 

Upgrading existing fender piles and working on modifications to the ramps The Ferry Terminal maintained its operations during the project.