Location:
Santa Rosalia, Mexico
Client:
Compañia Minera Caopas
Contract Value:
$13M
Type of contract:
Technical Service
Construction Manager
Start Date:
June 2016
Completion Date:
May 2017
VanPile’s scope of work for the Caopas Terminal rehabilitation consisted of:
Piles were 914 mm drilled through riprap and then driven with a diesel hammer to refusal. Length reached approximately 33.5 metres long.
Each of the dolphins had a cast-in-place pile cap. New sections of crane beam were set in place, connected and then placed into service with the radial ship loader transiting to a portion of the new rail. The old rail was removed and the remaining new beam set in place.
The work was completed while the existing damaged terminal was in operation.